Sunday, June 29, 2014

Picture(s) from Day 3

It doesn't look like much has happened today.  Look closely.  The main house and roof are sheathed, the porch roof is up and sheathed and there is ice shield on the edge of the roof.  What slowed us was the discovery that the gable end wall of the garage (very right hand side) was not plumb.  It took a lot of thinking, planning, grunting, sweating and endurance to get it pulled (with a Come-Along) into its proper position before we could sheath that part of the garage.  What you can't see is that almost all of the interior walls have also been built.  Oops, the shower/tub that was delivered was for a right hand installation (drain on the right side), but the plumbing was set up for a left hand unit.

Notice in the background that the second floor walls of the 2 story house is taking shape.