The extra mud on Amy's shoes added about 5 lbs. It stuck to everything and was impossible to get off.
Some pre-planning and building had taken place. The slab was poured and marked for walls. The window and door header/jack/stud/jams had been pre-build. Now just nail it all together. I think Amy and Lisle were really doing some powerful ministry by the number of nails that they drove.
It was a great first day.